|
|
 |
Eco-Systems services all major brands of Sprinklers and Low- Voltage Lighting systems. We provide 24-hour response time and immediate emergency service.
SERVICE IRRIGATION
-
Spring Service: Re-introduce water into water line and inspect the entire system for mainline, lateral and valve leaks. Check all heads for proper operation and adjustments. Examine controller for defects; i.e. dead batteries, bad contacts, rain sensor, etc. Program controller for Spring operation. Service is performed in March-April.
-
Fall/Winter Service: Purge the system by introducing compressed air into the main line and lateral lines. Close down all supply lines. Set controller to rain off. Note any problems for Spring turn on.
-
Service visits: Review all irrigation components for proper operation. Adjust all heads for proper throw and coverage. Clean and/or replace all nozzles not operating properly. Reprogram controller for seasonal conditions. Visits do not include major repairs: Damaged heads, valves, riser extensions, bad controllers, rain sensor, pumps and underground breaks. These items will be charged on a time and material basis.
-
Service Plans:
-
Basic- Spring service, Fall/Winter service and 3 service visits.
-
Full Service Plan- Spring service, Fall/Winter service and 6 service visits.
Service Low-Voltage Lighting
-
Service visit: Review all lighting components for proper operation. Straighten leaning fixtures and re-adjust all lights as needed. Replace failed lamps with the correct replacement lamps. Trim overgrown plant material away from fixtures to keep plant growth from blocking light output. Clean light lense, remove bugs and debris out of open fixtures. Examine transformer for defects: bad contacts, proper voltage output, dead timer, etc. Program transformer for operation. Service visit do not include major repairs, bad transformer, broken fixture, cut wires, bad bulbs. These items will be charged on a time and material basis.
-
Full Service Plan- 2 service visits which include daylight saving time adjustment to transformer.

State Drought Conditions

|
|
 |
|